Client: Residential
Year: June 2013
Work carried out:
- Removing old bathroom and preparing area
- Fitting new bathroom, including sanitary ware and shower fittings
- Tiling
Before and during the work:
- The old bathroom
- Preparing the area
- Mark at work
Client: Residential
Year: June 2013
Work carried out:
Before and during the work: